Get complete information related to latest Safety Door Tenders . from India at Classic Tenders. Search the best available tenders from Indian government tenders, domestic Safety Door Tenders , private tenders, online tenders, tender invitation notice, business tender notices, online tenders and bidding Safety Door Tenders.
Tender For bid to ras supply of nails 10 no , nails 12 no , nails 14 no , nails 17 no , nails 17 no headless , crank type hinges , ms hinges , drawer knob , wooden screw 8 no , wooden screw 10 no , wooden screw 20 to 5 , wooden screw 25 to 6 , black screw , ss tower bolt , ss hasp and staple , multi purpose lock , security and safetydoor chain , door pivot , ss door latch chain steel , door handle for mortise lock ss make godrej plaza door set , upvc window handles 9main building , door stopper , door closer , synthetic rubber adhesive , bed wheel , chair wheel
Tender For supply of set of welded partition frame for non ac bangladesh coach. note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25parnabang version 3, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securingthe components: - use steel straps or ropes to fimly anchor the components within thewooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorbshocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify thatall components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For supply of set of welded partition frame for bangladesh ac chair car coaches.note: make/manufacturer of raw material shall be m/s jsl or m/s sail., as per drawing: mp25paraccbang version 2, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plasticfilm or water proof ability paper, to guard against corrosion. 4. componentarrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed. 8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period: 30 months after the date of delivery ] ]
Tender For annual repair and maintenance of to ag office, at saifabad hyderabad during the year 2026-27. sh repairing of the toilets, aluminum partition work repairing of store by covering shed with sheets ms works, the flooring, waterproofing, internal painting, external painting,
Tender For construction of laboratory building, compound wall and security room for icmr niv, bangalore unit at kvafsu campus, hebbal, bangalore. sh: 1: (a) building portion including internal water supply, sanitary installations, external services connections, security cabin including toilets, filling earth, ug sump, drainage, internal cc roads and carparking, storm water drains with covers, kerb stones, rain water harvesting etc. in epc mode (design and build basis). (b) supply, installation, testing and commissioning of iei and fans and allied works, 3 x 400 kva substation, 2 no. 250 kva dg set, 1 no. 13p and 1 no. goods lift, online ups, centralized hvac and vrf/vrv ac system, solar pv system, solar water heating system, cctv, bms, epbx and lan, av system, firefighting and fire alarm system, 2 nos. water coolers, hepa filters, bibo, air compressors and 5 kld stp and 5 kld etp plant, street lighting, access control system, effluent decontamination system, bio safetydoors, wet showers, dynamic .... in epc mode (design and build basis)subwork/packages:sh: supply, installation, testing and commissioning of tfa and exhaust for bsl -2 lab 1st floor
Tender For corrigendum : tender for supply of valves and hoses -straightflow ball valve34 g female thread with hand lever , straightflow ball valve1 14 g female thread hand lever , spare seals kit for wafer valve dn32 , spare seals kit for wafer valve dn40 , spare seals kit for wafer valve dn50 , pressure reducing valve set at 30 bar , nut hhm20 , oring 29 x178 an1 80shore nitrile , shell partition gasket , coil , shell , pivot seat , stainless steel lugs 10m8 , stainless steel seat , stainless steel valve assembly pctfe insert , discharge needle , nitrile diaphragm , fourfold sealring 5017x533 , safety valve nd 20 , valve gasket , snap ring , cartridge type non return check valve g14type rb1 , lock washer nd10 , lock washer nd12 steel , lock wire , air hp hose peh500 bar nd15 m30x2 cual ruch union l0500 m , air lp hose peh26 bar nd25 cual ruch unions w elbow l1 m , flexible air peh500 dn15 raccord ruch cual lht750 , air hp hose peh500 bar od4216 od4826 ruch unions l075m , packing bs a8 pc851 , compensating sleeve nd50 , fresh water hose peh26 bar nd20 ruch unions l0750 m , lock tab washer nd8 stainless steel , any fluids hose peh26 nd06 38m20x15 cual unions l075 m , fresh water hose peh26 bar nd20 ruch unions l0500 m , fw hose peh26 nd32 od3340 ruch unionfir tree cplng l05m , compensating sleeve with internal rings nd80
Tender For supply of set of partition frame for lsdd amrit bharat 3.0 ( (note- colour scheme is as per design letter no md48161 dated- 15/05/2026 ), as per drawing: mp26pfgsab3.0 version 0, packing instruction: `packing condition of set of partition frame and procedure to achieve best possible protection during transportation: 1. surface preparation: - thoroughly clean the components to remove any dirt, grease or contaminants - apply a protective film, such as pvc or laser film or bubble sheet, to shield surfaces from scratches and environmental factor. 2. packing materials: - wooden crates: construct sturdy wooden cage tailored to the component's dimensions. - steel strapping: utilize rust-proof steel straps to securely bundle components, preventing movement during transit. 3. moisture barrier: - incorporate moisture-proof materials, such as plastic film or water proof ability paper, to guard against corrosion. 4. component arrangement: - place components on wooden pallets or within custom-designed supports to distribute weight evenly and prevent deformation. - ensure that no part of the component extends beyond the protective packaging to avoid exposure to potential damage. 5. securing the components: - use steel straps or ropes to fimly anchor the components within the wooden crate, minimizing internal movement. - for added stability, employ bracing or cushioning materials, such as foam pads or corrugated inserts, to fill voids and absorb shocks. - hardware items to be suitably packed separately inside the crate. 6. labeling and documentation: - clearly label each package with essential information, including pl no. specifications, details of each set with qty. and also keep one copy inside ot the crate, weight, handling instructions and firm's & destination details. 7. loading onto trailer/lorry/truck/transport: - strategically position the packaged components within the truck/suitable to maintain balance and prevent shifting during transit. - secure the packages to the container's structure using lashing ties or additional bracing as needed.8. final inspection and sealing: - conduct a thorough inspection to verify that all components are securely packed and that packaging materials are intact. [ warranty period:30 months after the date of delivery ] ]